Industrial site · Varketili, Tbilisi · 2025-01

Electrical installation for the 600 m² Hansa Flex production workshop in Varketili, Tbilisi: cable network design, 140 m of cable trays suspended on steel wires, cable pulling, Legrand Plexo sockets and switches, assembly and installation of a 110 kW main switchboard, power connection of machine tools. Completed in 28 days, December 2024 – January 2025.

Area, m²
600
Power, kW
110
Switchboards
1
Cable trays, m
140
Duration, days
28

Scope of work

Brands

ABB, IEK, WAGO, Phoenix Contact, Legrand