Car service of 390 m² in Kareli
Electrical installation for a 390 m² car service in Kareli: main switchboard with a changeover to generator backup power, distribution boards, cable trays, lighting, sockets and switches, grounding, video surveillance and a computer network. ABB, Efapel, IEK, WAGO. Power 30 kW, completed in 11 days, October 2026.
- Area, m²
- 390
- Power, kW
- 30
- Duration, days
- 11
Scope of work
- Distribution board
- Main switchboard
- Cable trays
- Lighting
- Sockets and switches
- Grounding
- Video surveillance
- Low-voltage networks
- Generator and ATS
Brands
ABB, Efapel, IEK, WAGO





